Modernization of Distribution Work Methods



  1. Transition of Distribution Work (HV Hot-line) Techniques
    1. Direct Work
      • Climbing a pole to reach the point of work
      • Risk of electric shock accidents and fatigue (especially in summer)
    2. Indirect Work
      • Indirect work through hot sticks
      • Risk of electric shock has been eliminated but fatigue due to working on overhead objects is still a problem
    3. Mechanized Work
      • Work that cannot be dome manually can be performed safely and accurately
      • Efficiency・・・・・・Three linemen reduced to one. Working time reduced by 1/2.

(1)Direct Work ,(2)Indirect Work ,(3)Mechanized Work

  • Characteristics and problems of the distribution working environment in quest of the 3Cs in Distribution Work (Cleanliness, Comfort, and Creativity)

Characteristics and problems of the distribution working environment in quest of the 3Cs in Distribution Work
back to page top
Copyright (c) 2010 KYUSHU ELECTRIC POWER CO. INC. All Rights Reserved.